CHG0080164 - CITZ MCS EMERALD - Apply updates and perform maintenance

» Published on Mon, 31 Aug 2026 13:00:00 +0000

  • Scheduled

    We will update some software, firmware, and cluster settings and perform a rolling restart of all nodes in the cluster.

    We will apply the latest firmware on the physical servers.

    We will upgrade Trident to v26.06.0 and enable concurrency. This has shown great speed improvements to PVC mount/unmount operations in the LABs.

    Switch to CGroups v2 to unblock future OpenShift upgrades.

    Switch the container runtime from runc to crun, as it is the default for OpenShift now.

    When?

    Aug 31st to Sept 4th

    Trident will be upgraded at 6am on the first day of the change.

    At 9am on the first day of the change we will begin restarting the master nodes first, then the infra nodes, and start on the worker nodes last.

    Node reboots will continue until 5pm each day, and resume at 9am the next day. Silver will pause over the weekend.

    Will there be an impact on the Platform apps?

    As nodes are rebooted pods will be rescheduled to another node. We expect the past issues with Trident taking a long time to start up pods will be solved, but will continue to use slow manual node drains and monitoring of Trident health.

    Do I need to do anything?

    Monitor your apps health.